在当前桥梁工程施工过程中,后张法预应力施工得到了广泛的应用,保证了桥梁的质量。但是在具体的施工过程中,需要结合实际情况做好施工过程的管理,消除周围不良因素,从而保证工程施工质量。
In the current bridge engineering construction, the post-tensioned prestressed construction has been widely used to ensure the quality of the bridge. But in the specific construction process, it is necessary to control the construction process combined with the actual situation, to eliminate the surrounding adverse factors, so as to ensure the quality of construction.
出处
《价值工程》
2017年第29期137-138,共2页
Value Engineering
关键词
后张法预应力
桥梁工程
施工管理
post-tensioned prestressing
bridge engineering
construction management