摘要
详细介绍了麻窝水电站利用反井钻机进行调压井导井施工及质量、安全控制措施,可为类似工程调压井导井施工提供参考、借鉴。
This paper introduces the construction of surge well guide well of Mawo Hydropower Station by using raise boring machine and the quality and safety control measures, to provide reference for the construction of surge well guide well in similar works.
出处
《价值工程》
2017年第30期117-119,共3页
Value Engineering
关键词
水电站
施工技术
安全控制
hydropower station
construction technology
safety control