摘要
本文根据贵阳市贵安新区天河潭路道路路基工程,对填石路堤施工工艺进行了分析,分别介绍天河潭路道路工程概况、试验路段、"三背回填区"压实、填石路堤压实、高填石路堤施工工艺,为填石路堤在贵阳地区施工提供借鉴。
Based on the Tianhetan Road Road Subgrade Project in Guiyang New District of Guiyang City, this paper analyzes the construction technology of the rock-fill embankment, introduces the general situation of Tianhetan Road Road Project, the test section, the compaction of the "three backfill", and high rock fill embankment construction process, to provide reference for the rock fill embankment in Guiyang construction.
出处
《价值工程》
2017年第30期125-126,共2页
Value Engineering
关键词
填石路堤
施工工艺
压实
rock-fill embankment
construction process
compaction