摘要
本文针对贵州省毕节市双山新区梨新大道甘河沟大桥工程,对拱圈施工进行分析,分别对测量准备、临时拱座施工、拱架安装施工、扣索施工、拱架预压、拱圈混凝土施工、拱架落架施工,在施工过程中只有严格按照施工组织进行,采用科学合理的工艺才能保证工程质量及施工安全。
In this paper, the construction of arch ring construction is analyzed in this paper. The construction of arch ring construction,temporary arch construction, arch installation and construction, buckle construction, arch preloading, arch ring concrete construction and arch landing gear construction are carried out for the construction of Ganhegou Bridge in Pixin Avenue, Shuangshan New District, Bijie City,Guizhou Province. In the construction process only in strict accordance with the construction organization and the use of scientific and reasonable technology, the quality and safety of the project can be ensured.
出处
《价值工程》
2017年第30期129-130,共2页
Value Engineering
关键词
临时拱座
拱架
预压
temporary arch
arch
preloading