期刊文献+

侧苏盐16-1井轨道设计方案优化研究与应用 被引量:1

Research and Application on Track Design Plan Optimization of 16-1 Well of Cesu Salt
下载PDF
导出
摘要 老井苏盐16-1井投产后发生井堵,需侧钻与水平井眼连通,且避开井眼堵塞的泥岩段,才能恢复生产。根据要求设计了3套侧钻方案,综合考虑资源利用和各方案的实施难度,确定使用下部开窗侧钻方案。并对该方案钻具组合造斜能力和管柱通过能力进行分析,推荐合理的实施措施,在侧苏盐16-1井成功应用。 Old well Su Salt Wells happens blocking in the aftermath of the 16-1 well. It needs side tracking and horizontal hole connected, and avoided the hole plugging mud-stone section in order to resume production. According to requirements, we designed the 3sets of side tracking schemes by considering the resource utilization and the scheme of the implementation of the difficulty, and determined to use the lower window side tracking scheme. And this paper provided analysis of the deflecting capacity and string ability, and recommended the implementation of reasonable measures. Finally, the measures could be successfully applied in Cesu salt 16-1 Well.
出处 《中国井矿盐》 CAS 2017年第5期15-16,31,共3页 China Well and Rock Salt
关键词 盐井 侧钻方案 造斜能力 管柱通过 Salt well side drilling scheme deflecting capacity string ability
  • 相关文献

参考文献2

二级参考文献8

共引文献19

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部