期刊文献+

考虑设备修复非新的非等效并行jobshop调度联合优化 被引量:1

A Joint Optimization of Non-Identical Parallel Mutil-Machine Job Shop Scheduling with Consideration of Imperfect Maintenance Effect
下载PDF
导出
摘要 针对带有非等效并行机的作业车间调度问题,提出一种考虑设备预防性维护和生产线调度的联合优化模型。以最小化最大完工时间为优化目标,考虑设备修复非新。设计了一种两阶段遗传算法进行求解。为验证所提出的联合优化模型的有效性,将其与不同维护策略下车间最大完工时间的实验数据结果相比较,结果反映该模型效果更好。 Aiming at job-shop problem with non-identical parallel multi-machine scheduling,a joint optimization model is proposed with considering both preventive maintenance and production scheduling. The object of problem is to minimize the maximum completion time. Meanwhile,the equipment cannot be repaired to a new level is considered. A two-stage genetic algorithm is designed to solve this problem. In order to verify the validity of this joint optimization model. Comparing the experimental data with the maximum completion time of the workshop under different maintenance strategies,the results reflect that this model works better.
出处 《物流工程与管理》 2017年第8期150-153,共4页 Logistics Engineering and Management
基金 国家自然科学基金资助项目(No.71472125)
关键词 预防性维护 非等效并行机 作业车间 修复非新 遗传算法 preventive maintenance non-identical parallel multi-machine job shop imperfect maintenance effect genetic algorithm
  • 相关文献

参考文献6

二级参考文献69

  • 1张丽华,涂菶生.带有可控性维护的单机调度问题研究[J].吉林大学学报(信息科学版),2004,22(4):303-305. 被引量:5
  • 2崔建双,李铁克,张文新.混合流水车间调度模型及其遗传算法[J].北京科技大学学报,2005,27(5):623-626. 被引量:29
  • 3张丽华,涂菶生.目标函数为加权完成时间和的单机维护调度问题研究[J].南开大学学报(自然科学版),2006,39(1):36-42. 被引量:2
  • 4轩华,唐立新.实时无等待HFS调度的一种拉格朗日松弛算法[J].控制与决策,2006,21(4):376-380. 被引量:25
  • 5R. H. P. M. ArtS, G. M. Knapp, M. J. Lawrence. Some aspects of measuring maintenance in the process industry [Jl. Journal of Quality in Maintenance Engineering, 1998, 4: 6-11.
  • 6C.J. Liao, W. J. Chen. Single-machine scheduling with periodic maintenance and nonredeemable jobs [J]. Computers and Operations Research, 2003, 30:1335-1347.
  • 7M. Ji, Y. He, T. C. E. Cheng. Single-machine scheduling with periodic maintenance to minimize makespan [J]. Computers & Operations Research, 2007, 34: 764-1770.
  • 8M. Sbihi, C. Varnier. Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness [J]. Computers & Industrial Engineering, 2008, 55: 830-840.
  • 9C. Low, M. Ti, Ch-J Hsu, Ch-T Su. Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance [J]. Applied mathematical modeling, 2010, 34: 334-342.
  • 10Ch. Low, Ch-J Hsu , Ch-T Su. A modified particle swarm optimization algorithm for a single-machine scheduling problem with periodic maintenance [J]. Expert Systems with Applications.2010.37: 6429-6434.

共引文献61

同被引文献10

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部