摘要
构建了一、二维潮流数学模型,选择了洪水"96·6"、中洪水"99·7"、枯水"2001·2""2005·6"(洪水大潮)、"2003·7"(中水大潮)和"9317"风暴潮6组有代表性的洪、中、枯水期的水文组合,模拟计算了横琴南部围填海工程近期、远期规划方案对附近水道及周边水域的影响,得出了远期规划方案对附近水道有明显不利影响的结论。
By using the ID and 2D mathematical model, choosing the hydrology group of flood "98.6", the medium flood "99.7", the dry flood "2001.2", the "2005.6"(flood spring tide), the "2003.7"(medium spring tide) and the "9317"storm tide, it simulates the effect of the recent and long-term sea reclamation planning scheme in the south of Hengqin district on the nearby waterways and the surrounding water. The conclusion is given that the long-term planning scheme has obvious adverse effect on nearby waterways.
出处
《黄河水利职业技术学院学报》
2017年第3期1-6,共6页
Journal of Yellow River Conservancy Technical Institute
关键词
珠海横琴
围填海工程
近期规划
远期规划
防洪潮影响论证
潮流数学模型
Hengqin in Zhuhai
sea reclamation
recent planning scheme
long-term planning scheme
effect demonstration of flood and tide control
1D and 2D tide mathematical model