摘要
该文以武汉东湖通道工程二标段的安全监测为工程背景,对双层钢板桩土芯组合围堰和车道基坑这两项核心项目的监测内容和监测方式进行了详细说明,并对监测数据进行整理分析。
Based on the safety monitoring of the second section of East Lake underground project in Wuhan,this paper specifically described the monitoring contents and methods of the two core aspects(the double-layer steel sheet pile soil core combination cofferdam and the lane foundation pit)and analyzed the monitoring data.
出处
《建材世界》
2017年第4期103-107,共5页
The World of Building Materials
关键词
工程监测
浅湖淤泥地质
双层钢板桩土芯组合围堰
车道基坑
engineering monitoring
shallow lake silt geology
double-layer steel sheet pile soil core combination cofferdam
lane foundation pit