高地应力强膨胀性泥灰岩隧道多层拱架支护施工应用研究 被引量:5

Application Research on Construction of High Geostress and High-expansion Marl Tunnel Multiple Arch Support
下载PDF
导出
摘要 以阿尔及利亚甘塔斯隧道膨胀性泥灰岩挤压破碎带为背景,为了克服高地应力泥灰岩隧道初期支护变形大、易失稳的施工难题,提高隧道施工机械化程度,加快施工进度,甘塔斯隧道采取了玻璃纤维锚杆加固掌子面,多层拱架支护的施工方式,挖掘机配液压破碎锤全断面开挖,有效避免开挖后掌子面失稳造成的坍塌等灾害发生,提高了隧道施工机械化程度,有效提高施工工效。 Based on the expanding marl compresso-crushed zone of Gantas Tunnel in Algeria,and in the purpose of overcoming the construction problems of large deformation and instability of high geostress marl tunnel primary support,therefore to enhance the level of mechanization of tunnel construction and accelerate the construction progress. Gantas Tunnel has adopted construction methods like glass fiber anchor reinforcement constraints,multiple arch support and full face excavation by using excavator and hydraulic breaking hammer,in order to avoid the occurrence of collapse due to instability of the constraints after excavation,thus improving the level of mechanization of tunnel construction and increasing the construction efficiency.
作者 薛兴伟
出处 《铁道建筑技术》 2017年第8期77-79,83,共4页 Railway Construction Technology
基金 中国铁建股份有限公司科技研究开发计划项目(10-07C)
关键词 多层拱架支护 高地应力 强膨胀性 泥灰岩 隧道施工 multiple arch support high geostress high-expansion marl tunnel construction
  • 相关文献

参考文献10

二级参考文献63

共引文献74

同被引文献36

引证文献5

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部