深基坑渗漏水防治施工技术 被引量:13

Prevention and Control Construction Technology of Water-leaking in Deep Foundation Pit
下载PDF
导出
摘要 天津地铁6号线育梁道站为富水软土地层,地连墙施工过程中,通过加强泥浆控制、刷壁、超声波检测和锁口管安装及拔出工艺进行接缝质量控制;基坑开挖前,对地连墙接缝缺陷进行高压旋喷桩注浆处理及预埋袖阀管;开挖过程中遵循"降水、探挖、架撑、开挖、监测五位一体"的施工方法,有效地控制了基坑渗漏水,实现了安全、优质、高效的施工目标。 The Yuliangdao Station of Tianjin Subway Line 6 lies in water-rich soft soil strata. In the construction process of diaphragm wall,the quality control of the joints was done by strengthening the mud control,brushing the wall,the ultrasonic testing,installation of the lock pipe and the extraction technology. Before the excavation of the foundation pit,the cracks of the diaphragm wall should be dealt with by the high-pressure jet grouting pile and pre-buried sleeve valve pipe. In the excavation process,the five-in-one construction method of "precipitation,digging,frame bracing,excavation and monitoring"should be adopted,which could effectively control the water leakage of foundation pit and achieve construction goals of safety,high quality and efficiency.
作者 高琪
出处 《铁道建筑技术》 2017年第8期97-100,110,共5页 Railway Construction Technology
基金 中铁十二局集团第四工程有限公司科技研究开发计划项目(公司技[2013]78号-09)
关键词 深基坑 地连墙 开挖 渗漏水防治 deep foundation pit diaphragm wall excavation preventive treatment of water seepage and leakage
  • 相关文献

参考文献5

二级参考文献8

共引文献126

同被引文献86

引证文献13

二级引证文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部