摘要 立井井筒作为整个矿井提升人员、通风、运料的主要通道,其安全性尤为重要,开展壁间注浆技术研究对井筒施工安全有着特别重要的意义,论文通过理论分析结合现场实际研究确定了井筒壁间注浆合理的注浆时间,对注浆压力进行了理论校核,同时优化了注浆工艺参数,并采用上部加固与下部支撑相结合的方式对冻结管进行了预防加固,实现了矿井井筒的安全高效掘进,这为类似条件矿井的安全生产提供了参考。 The shaft of mine as the main channel of miner, ventilation, material transport, its security is particularly important ,so it is veryimportant to study the technology of backwall grouting for the safety of shaft construction.This paper through theoretical analysis research todetermine the reasonable grouting time ofbackwall grouting grouting pressure on the theory calculation, and optimize the process parameters ofgrouting and the upper and the lower supporting reinforcement combining way of freezing pipe to prevent reinforcement, ande realized safe and efficient drivingshaft,whichprovidesareferenceforthesimitarminesafetyproductiorr
作者 向东辉
出处 《煤矿现代化》 2017年第6期33-35,38,共4页 Coal Mine Modernization
关键词 大断面井筒 壁间注浆 注浆压力 注浆参数 冻结法施工 large cross section shaft backwall grouting grouting pressure grouting parameters freezing construction
  • 相关文献

参考文献16

二级参考文献153

共引文献2142

同被引文献26

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部