摘要
文章阐述了广西内河水运量及过闸运量预测作为枢纽通航建筑物建设规模确定基础性工作的重要性,梳理了水路运输的特性、水运预测需考虑的几点因素,并结合工作实际对广西内河水运量及主要过闸运量预测的方式方法进行了总结。
This article described the importance of Guangxi inland water transport volume and gate- passing volume forecasting as the basic work of determining the construction scale of hub navigation buildings, introduced the characteristics of waterway transportation and several factors to be consid- ered in water transport forecasting, and then in combination with work practices, it summarized the main forecasting ways and methods for inland river water transport volume and gate-passing volume in Guangxi.
出处
《西部交通科技》
2017年第11期112-115,共4页
Western China Communications Science & Technology
关键词
内河水运量预测
枢纽过闸运量预测
Inland river water transport volume forecast
Hub gate-passing volume forecast