摘要
隧洞工程施工过程中,湿陷性黄土遇水后容易出现破坏变形,为了保证隧洞工程施工质量,需要制定合理的施工方案。本文以实际工程为例,针对隧洞工程的地质情况制定了隧洞开挖方案,并对隧洞施工的关键技术进行了分析,保证了隧洞工程顺利完工。
Wet collapsible loess is prone to damage and deformation due to contact with water in the process of tunnel engineering construction. A reasonable construction plan should be formulated in order to ensure the quality of tunnel engineering construction. In the paper,the actual project is adopted as an example. A tunnel excavation plan is formulated aiming at geological conditions of tunnel engineering. Key technologies of tunnel construction are analyzed so as to ensure the successful completion of the tunnel engineering.
出处
《中国水能及电气化》
2017年第7期1-3,70,共4页
China Water Power & Electrification
关键词
湿陷性黄土
引水隧洞
施工
安全监测
wet collapsible loess
water diversion tunnel
construction
safety monitoring