贯通工程在矿山的建设与生产中起着十分重要的作用。贯通测量差之毫厘谬以千里,容不得丝毫马虎,要不得讲究与凑合,这就要求工程技术人员在施工中严谨细致,严格要求。本文对矿山贯通工程进行分析,探讨提高贯通精度及效率。
The transfixion project plays a very important role in the construction and production of the mine.Through a survey of a poor,can not tolerate the slightest careless,not pay attention to and improvise,which requires engineering and technical personnel in the construction of rigorous and meticulous,strict requirements.In this paper,the holing through project of mine is analyzed,and the accuracy and efficiency of holing through are discussed.