摘要 分析了当前拱桥的施工技术,针对等切面悬链线钢筋混凝土箱拱进行技术改进,提出了预制等切面悬链线钢筋混凝土箱拱施工技术,采用专门的预制场地,施工方便,不影响其它工序的进度,达到节约时间,提高效率,降低施工费用的目的。通过平面作业,减少了浇筑混凝土等工序的高空作业,降低安全事故发生概率。 This paper analyzes the current construction technology of arch bridge, for the innovation of precast reinforced concrete box arch section catenary, proposes the prefabricated construction technol- ogy of reinforced concrete box arch section catenary, prefabricated site, special construction is convenient, does not affect the progress of other processes, save time, improve efficiency, reduce the construction cost. Through the plane operation, reducing the pouring of concrete and other processes of high - altitude operations, and the probability of safety accidents is reduced.
作者 史文超 SHI Wenchao(Anhui University of Science and Technology, Anhui Huainan 232000, Chin)
机构地区 安徽理工大学
出处 《低温建筑技术》 2017年第9期78-80,83,共4页 Low Temperature Architecture Technology
关键词 钢筋混凝土箱拱 平面作业 高空作业 reinforced concrete box arch plane operation high altitude operation
  • 相关文献

参考文献5

二级参考文献10

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部