期刊文献+

钢管混凝土斜交框筒节点试验研究 被引量:3

Experimental study on intersecting connections used in CFT diagrid frame tube
原文传递
导出
摘要 钢管混凝土斜交网格框筒的网格节点汇集了斜柱、环梁、径向梁等构件,其构造和应力分布较为复杂。为了改进该类节点的受力性能,针对工程实际,设计了核心区采用转换柱体与中央竖板相结合的节点构造形式,并以相贯的方式与斜柱连接。为研究此类节点的承载能力和破坏形态,验证节点构造的合理性,实现"强节点弱构件"的设计目标,进行了6个缩尺比为1∶5.5的柱倾斜45°的节点模型试验,在10 MN级自平衡钢结构加载架内,采用两个5 MN千斤顶对相贯节点的柱端施加轴向荷载。结果表明,节点设计符合"强节点弱构件"的设计要求,即使节点区混凝土浇筑不密实,节点的受力性能也能够达到设计要求,节点的设计方法可行,构造合理。 The intersecting connection of CFT diagrid frame tube connects members including inclined columns, ring beams and radial beams, etc. The construction and stress distribution are complicated. To improve the performance of such nodes, a new form of node is developed for such type of structure : transferring cylinder with reinforcing central plate at core zone and connected to the inclined column by penetration welding junction. In order to verify the rationality of the connections and to investigate the performance, capacity, failure mechanism, and to assure that the capacity of connections can exceed that of structural members, six 1 : 5.5 scaled models were tested using a self- balancing equipment with a 10 000 kN capacity loading frame. Two axial forces are applied at the end of inclined columns of diagrid nodes with 5 000 kN jacks. Test results indicate that node design conforms to the principle of 'strong node weak component'. Even if concrete at the node area is not poured densely, the node performance can also meet the design requirements, and the design method and construction detail are reliable.
出处 《建筑结构学报》 EI CAS CSCD 北大核心 2017年第10期29-37,共9页 Journal of Building Structures
关键词 交叉网格框架 钢管混凝土柱 相贯节点 静力试验 受力性能 diagrid outer tube CFT column intersecting connection monotonic loading test mechanical behavior
  • 相关文献

参考文献3

二级参考文献19

  • 1张小冬,刘界鹏.大连中国石油大厦结构方案优化设计[J].建筑结构学报,2009,30(S1):27-33. 被引量:10
  • 2周健,汪大绥.高层斜交网格结构体系的性能研究[J].建筑结构,2007,37(5):87-91. 被引量:68
  • 3蔡绍怀 焦占栓.钢管混凝土短柱的基本性能和强度计算[J].建筑结构学报,1984,(6):13-34.
  • 4钟善桐 苗若愚.钢管混凝土轴心受压构件承载力计算的研究[J].建筑结构学报,1984,(6):38-48.
  • 5方小丹,韩小雷,韦宏.广州珠江新城西塔巨型斜交网格外筒节点模型试验报告[R].广州:华南理工大学建筑学院,2006.
  • 6Huang C S, Yeh Y K, Liu G Y. Axial load behavior of stiffened concrete-filled steel columns [ J ]. Journal of Structural Engineering, 2002, 128(9) : 1222-1230.
  • 7Gupta P K, Sarda S M, Kumar M S. Experimental and computational study of concrete filled steel tubular columns under axial loads[J]. Journal of Constructional Steel Research, 2007, 63 (2): 182-193.
  • 8方小丹,曾宪武.广州珠江新城西塔巨型斜交网格外筒节点试验模型有限元分析及简化设计方法[R].广州:华南理工大学,2006.
  • 9CECS28:90.钢管混凝土结构设计与施工规程[S].[S].,1990..
  • 10蔡绍怀.现代钢管混凝土结构[M].北京:人民交通出版社,2003..

共引文献101

同被引文献25