摘要
袁店一井煤矿东风井立井掘砌施工期间,采用打泄水孔与井下已有巷道连通,井壁淋水及井筒涌水通过泄水孔下泄至已有巷道,并通过永久排水系统排至地面的治水方案,有效地解决了水患问题,为井筒的顺利掘砌创造了良好条件,为类似矿井的水害治理提供了参考经验。
During Yuandian Yijing Coal Mine Dongfeng shaft digging,using drainage holes and underground existing tunnel has connected ,spraying and gushing water through the drainage hole discharged into the existing tunnel,and the permanent drainage system to the ground,effectively solve the problem of flooding,and created a good condition for the shaft digging,provide a reference for the similar mine water disaster control.
作者
彭彭
郭飞
秦道谋
PENG Peng GUO Fei QIN Dao-mou(No.29 Construction Department, China Coal Mine Construction Group, Suzhou 234000,China Yuandian Yijing Coal Mine, Huaibei Mining Group Co., Ltd., Huaibei 235000, China Huaibei Huaiwu Construction Supervision Co., Ltd., Huaibei 235000, China)
出处
《煤矿机械》
2017年第9期115-116,共2页
Coal Mine Machinery
关键词
泄水孔
防治水
井筒
立井施工
筛管
drainage hole
water prevention
shaft
shaft construction
sieve tube