煤矿综放工作面地面注浆堵水工程实践 被引量:3

Ground Grouting Water Blocking Practice in Coal Mine Fully Mechanized Caving Face
下载PDF
导出
摘要 针对某煤矿综放工作面突水严重,采用地面注浆堵水法进行工作面突水治理,通过选择合理的注浆工艺和注浆材料实施注浆工程施工,然后观测注浆后井上、下水文的变化情况,结果表明利用注浆堵水法可成功实现井下综放工作面突水灾害的治理,为其他类似矿井的突水灾害治理提供了技术指导。 Aiming at the serious water bursting in a fully mechanized top coal caving lace m a coal mine, the ground watering method is used to control the water inrush. By selecting reasonable grouting technology and grouting material, the grouting construction is carried out, and then the change of hydrological up and down after grouting is observed. The results show that the use of grouting water shutoff can successfully realize the treatment of water inrush from the fully mechanized top coal caving mining face, and provide technical guidance for the management of watedogging in other similar mines.
作者 袁正勇 YUAN Zheng-yong(Chongqing Research Institute Co.,Ltd., China Coal Technology and Engineering Group, Chongqing 400037, Chin)
出处 《煤矿机械》 2017年第9期130-131,共2页 Coal Mine Machinery
关键词 煤矿 综放工作面 突水 注浆堵水 coal mine fully mechanized top coal caving face water inrush grouting water shutoff
  • 相关文献

参考文献9

二级参考文献35

共引文献312

同被引文献21

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部