期刊文献+

迎采动沿空掘巷窄煤柱合理宽度的研究 被引量:14

Study on reasonable width of narrow coal pillar for gob-side entry driving toward mining
下载PDF
导出
摘要 以棋盘井煤矿0913回风巷道掘进工程为背景,采用理论计算和数值模拟的方法研究了沿空掘巷窄煤柱的合理宽度。首先,通过极限平衡理论计算出窄煤柱合理宽度为5.08 m。然后,利用FLAC^(3D)数值模拟软件分析了不同的煤柱宽度对巷道围岩造成的变形影响,得出窄煤柱的合理宽度为5~6m。为了现场施工管理方便,最终确定合理的窄煤柱宽度为5m。 Based on the 0913 return air way tunneling project of Qipanjing Coal Mine,we applied theoretical calculation and numerical simulation to study the reasonable width of narrow coal pillar for gob-side entry driving. First, we calculated the reasonable width of narrow coal pillar with the limit equilibrium theory,and the result is 5. 08m; then,analyzed roadway surrounding rock deformation under different width of coal pillar using FLAC^3D numerical simulation. It result showed that,the reasonable width of narrow coal pillar was 5 - 6m. Finally,5m narrow coal pillar was applied considering the construction management.
作者 孟海东 田睿 徐严军 MENG Hai -dong TIAN Rui XU Yan- jun(Institute of Mining Engineering, Inner Mongolia University of Science and Technology, Baotou 014010, China Shenhua Wuhai Energy Co. , Ltd. , Wuhai 016000, China)
出处 《煤炭工程》 北大核心 2017年第9期36-39,共4页 Coal Engineering
关键词 沿空掘巷 窄煤柱 合理宽度 数值模拟 roadway in gob driving narrow coal pillar reasonable width numerical simulation
  • 相关文献

参考文献5

二级参考文献44

共引文献51

同被引文献111

引证文献14

二级引证文献104

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部