摘要
根据对某110kV变电站空置场地高回填区边坡预采用的多个挡护设计方案的研究,从工程地质、施工场地、工期、投资等进行全面分析与比选,最终选定了较优的设计方案,达到了在满足安全的条件下,便于施工、工期短、投资省的目的。
such as the The retaining schemes engineering geology, meets the safety requirement and investment is finally selected. for the high backfill slope in a 110 kV substation are compared from different aspects construction area and time required, and total investment. The optimal scheme that also with advantages in the construction convenience, short construction time and less
作者
陈春雷
CHEN Chunlei(Yichang Branch of Powerchina Zhongnan Engineering Corporation, Yichang 443002, Chin)
出处
《水电与新能源》
2017年第9期12-14,共3页
Hydropower and New Energy
关键词
开挖
支护
比选
excavation
slope retaining
comparison and selection