摘要
综合分析了阳城电厂 6× 35 0 MW机组热控系统配置、设计、功能等方面的特点 ,并对存在问题的改进、优化方案进行了详细的论证 。
This paper gives a synthetical description in the respects of configuration design and function of I&C system in Yangcheng power plant.It also makes discussions on improving and optimizing plan.The author puts forward his long term thought about the design for unit whole automatic level and optimization for control system.
出处
《山西电力》
2002年第A01期6-8,34,共4页
Shanxi Electric Power