摘要
介绍了地面转运煤系统在大同某公司部分矿井的改造背景,从受煤坑、地下运煤地道、地上运煤走廊等方面,论述了系统改造的主要设计流程,并归纳了设计时需注意的问题,旨在为同类工程设计提供一些参考。
The paper introduces the reconstruction background for partial mine wells of some company in the ground transport coal system,indicates the main design procedure for the system reconstruction from the coal pit,underground coal transport underpass,and ground coal transport corridor,and sums up the problems in the design,so as to provide some reference for similar engineering design.
出处
《山西建筑》
2017年第24期45-46,共2页
Shanxi Architecture
关键词
受煤坑
运煤地道
运煤走廊
铁路装车点
coal pit
coal transport underpass
coal transport corridor
rail loading point