期刊文献+

东曲矿顶板走向长钻孔取代高抽巷可行性研究 被引量:1

Feasibility Study and Engineering Practice of Replacing High Pumping Roadway with High Level Drilling Field in Dongqu Coal Mine
下载PDF
导出
摘要 针对东曲矿突出煤层工作面瓦斯含量高、瓦斯压力大、开采强度高的特点,结合当前矿井采用的高抽巷和顶板走向长钻孔抽采方法,从瓦斯抽采理论、现场实践、瓦斯抽采效果、经济性和施工周期等方面进行对比,根据工作面瓦斯分布规律,分析研究了顶板走向长钻孔代替高抽巷的可行性。 For Dongqu coal mine coal seams group face the characteristics of high gas content and big gas pressure,high mining strength,combined with extraction methods of high gas drainage way and roof to long borehole adopted in coal mine at present,based on the theoretical analysis and field practice,the gas extraction effect,economy and construction period on the contrast,feasibility analysis high pumping lane instead of high level field,finally according to the overall gas distribution regularity of working face.
作者 刘向忠
出处 《山西焦煤科技》 2017年第8期148-150,共3页 Shanxi Coking Coal Science & Technology
关键词 顶板走向钻孔 高抽巷 抽采方法 High level drilling field High pumping lane Extraction methods
  • 相关文献

参考文献1

二级参考文献4

同被引文献13

引证文献1

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部