摘要 水库短期优化调度关系到水库中长期调度计划能否顺利在厂间实现,是水电站实际运行中的重要一环。为保证短期优化调度制定的计划满足电网稳定运行的要求,在一般短期优化模型的基础上加入电网稳定性约束,以发电量最大为目标建立梯级水电站短期优化调度模型,采用逐步优化算法(POA)进行求解,寻求梯级水库系统在满足电网稳定运行基础上的最优运行方式。以雅砻江流域"锦官电源组"3级水库群为例,进行了考虑电网约束的梯级水电站短期优化调度,并与传统优化调度模型的调度结果进行对比分析。分析结果表明,调度结果满足电网稳定性要求,更有利于电网安全、稳定运行。 The short-term reservoir operation, which is concerned with the execution of the long-term operation plan in hydropower station, is one important process during the station operation. In order to ensure the the stable operation of power grid when execute the generation plan made by the short-term reservoir operation, this paper adds the grid' s constraints to the traditional operation model and set up a new short-term reservoir operation model taken the maximization generation of hydropower as the objective function. This paper solves the model using the POA to seek the best operation way on the basis of the safety and stabilization of the power grid. This paper takes the "Jinguan" of Yalong River as an example to set up a short-term reservoir operation model concerned the power grid' s constraints and compares the operation result of traditional model.
出处 《中国农村水利水电》 北大核心 2017年第9期191-195,201,共6页 China Rural Water and Hydropower
基金 "十三五"国家重点研发计划课题(2016YFC0402208 2016YFC0402308 2016YFC0402309) 国家自然科学基金(51279062 51679088 51509001) 中央高校基本科研业务费专项资金(10QX43 2015XS50) 安徽省自然科学基金(1608085QE112)
关键词 电网稳定性 短期优化调度 雅砻江流域 梯级水电站 逐步优化算法 power grid' s stabilization short-term reservoir operation Yalong River cascade reservoirs POA
  • 相关文献

参考文献5

二级参考文献27

共引文献50

同被引文献50

引证文献5

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部