摘要
本文结合工程实例,主要介绍了不同比例尺精度条件下两期间土方量计算的方法、步骤以及对成果的处理等,其计算结果得到了评审专家组和甲乙双方的一致认同。实践证明,此方法对类似土方量计算问题具有一定的借鉴作用,其更好地服务于工程建设。
In this paper, the method, the procedure and the processing of the results of the earthwork volume calculation in the two period are introduced, the results of the calculation have been confirmed by the expert group and both parties. Practice proves that this method has a certain reference to the similar earthwork calculation problem, more better serve the project.
出处
《中国建材科技》
2017年第4期101-102,共2页
China Building Materials Science & Technology