三山岛金矿断裂带矿床开采的稳定性分析 被引量:1

Stability Analysis of Ore Mining at Fault Zone in Sanshandao Gold Mine
下载PDF
导出
摘要 借助三维地质建模软件GDCAD建立仿真模型并进行网格划分,将节点及单元信息导入FLAC^(3D)中对开采全过程进行数值模拟计算,分析断裂带的长度及断裂带与矿体之间的距离对矿体开采稳定性的影响。结果表明:断裂带与矿体之间的距离近时,矿区上部基岩沉降量为8 cm,间柱底面应力高达17 MPa,间柱及顶间柱的剪切破坏覆盖面积较大;相比之下,断裂带与矿体之间的距离较远时稳定性较高;断裂带较短时,应力集中于断裂带与矿体之间的上部岩体,矿区上部基岩沉降量及间柱底面应力都较小。为矿山不同工况下的间柱及顶间柱的设计与施工提供了依据和指导,同时也为设计监测方案提出了可行性建议。 The simulation model was established by three-dimensional geological modeling software GOCAD,and the mesh partition is made. The node and unit information were introduced into FLAC^(3D)to make numerical simulation on the whole process of mining. The effect of the length of the fault zone and the distance between the fault zone and the ore body on the stability of the ore body mining was analyzed. The results show that when the distance between the fault zone and the ore body is short,the settlement of the upper bedrock is 8 cm,the stress between the bottom of the rib pillar is as high as 17 MPa,and the coverage of shear failure between the rib pillar and top pillar is large; In contrast,when the distance between the fault zone and the ore body is longer,its stability is higher; When the fault zone is short,the stress concentrates on the upper rock mass between the fault zone and the ore body,the settlement of the upper part of the bedrock and the stress between the bottom of the rib pillar are smaller. The analysis provides the basis and guidance for the design and construction of the rib pillar and the top pillar under different working conditions. At the same time,some feasible suggestions for setting up the monitoring program are put forward.
出处 《金属矿山》 CAS 北大核心 2017年第9期35-39,共5页 Metal Mine
基金 国家自然科学基金项目(编号:41272329 51379065)
关键词 GOCAD FLAC3D 断裂带 间柱 沉降量 GOCAD FLAC3D Fault zone Rib pillar Settlement
  • 相关文献

参考文献11

二级参考文献110

共引文献94

同被引文献13

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部