期刊文献+

朔黄铁路庄里滹沱河大桥桥面无缝线路设计研究

Study on Design of Continuously Welded Rails on Hutuo River Bridge of Zhuangli on Shuohuang Railway
下载PDF
导出
摘要 基于有限元分析软件,以朔黄铁路庄里滹沱河大桥桥面无缝线路设计为例,用两种设计方法对线路的钢轨强度、稳定性、断缝值等进行检算,以便判断是否可以取消既有的伸缩调节器。结果表明:无缝线路桥上连续梁钢轨最大伸缩附加力位于5号墩处;全桥采用常阻力扣件,不设钢轨伸缩调节器,钢轨强度检算的应力超过钢轨容许应力;桥上部分地段铺设小阻力扣件,其强度、稳定性以及断缝的检算均符合要求,即既有桥上钢轨伸缩调节器可以取消。 Based on finite element analysis software, taking the circuit design of CWR on Hutuo River Bridge of Zhuangli on Shuohuang Railway as an example, two design methods are used to check the elements such as rail strength, stability, and broken gap in order to determine whether the existing retractable adjuster can be canceled. The results show that the maximum retractable additional force of the rail on the continuous beam of CWR is located at pier No. 5. The whole bridge adopts constant resistance fastener without rail retractable adjuster, and the stress of rail strength checking exceeds the allowable stress of rail. The small resistance fastener is laid on some sections of the bridge, and the checking of its strength, stability and broken gap meets the requirement. That is, the rail retractable adjuster on the existing bridge can be cancelled.
作者 李晓军 LI Xiaojun(Xi'an Railway Survey and Design Institute Co. ,Ltd. Xi'an Shaanxi 710054, China)
出处 《盐城工学院学报(自然科学版)》 CAS 2017年第3期74-78,共5页 Journal of Yancheng Institute of Technology:Natural Science Edition
关键词 桥上无缝线路 线路设计 有砟轨道 检算 continuously welded rails on bridge circuit design ballasted track check-calculate
  • 相关文献

参考文献8

二级参考文献67

共引文献79

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部