火力发电厂炉膛压力保护功能优化

Optimization of Furnace Pressure Protection Function in Thermal Power Plant
下载PDF
导出
摘要 漳州某电厂5、6、7机组为600 MW容量发电机组,锅炉主设备采用ALSTOM-CE锅炉。由于所设计的炉膛压力保护回路存在仪表取样管飞灰堵塞、仪表进水及数字输入模件故障可能,影响机组运行安全。文章介绍了原设计压力保护回路存在的不足之处,及针对不足之处所做的相关技术改善,消除机组运行过程中所存在的安全隐患。 A power plant 5,6,7 unit in Zhangzhou is 600 MW capacity generator set.The boiler main equipment adopts ALSTOM-CE boiler.As the design of the furnace pressure protection circuit there is instrument sampling tube fly ash plug, instrument water and digital input module failure may affect the operation of the unit safety.This paper introduced the shortcomings of the original design pressure protection circuit, and made some related technical improvements to eliminate the hidden safety problems during the operation of the unit.
作者 龚建辉
出处 《企业技术开发》 2017年第9期71-72,共2页 Technological Development of Enterprise
关键词 炉膛压力 保护 MFT(主燃料跳闸) 控制逻辑 furnace pressure protection MFF(main fuel trip ) control logic
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部