摘要
为解决BIM模型在建筑工程现场的落实问题,通过区分BIM工作流程中决策层和执行层的差异,提出了新的工作模型。新模型充分考虑现场应用环节的需求,设计了"全纵剖管线安装图"(FLP)来实现从信息量巨大的完整BIM数据集中提炼、过滤、简化出贴合现场需求的信息。该图具有信息量完备、准确、简洁的特点,实现对全部管线关键信息快速调用,有效发挥BIM模型的潜能,提高了施工效率和质量。
To implement BIM model to physical installation,the procedure and organization of the construction is investigated and the demand difference between decision-makers and executors is discovered which blocks the implement from model to real before. Base on that,a standard of drawings,named "FLP(fully longitudinal profile) "is advised which is used for abstracting necessary information for site-supervision from sophisticated BIM data-set sufficiently. The abstracted result which is saved in a drawing specifies the section dimensions of pipe,location in plan and elevation of pipe and bands.Engineer in site can complete the installation just by following the specifications comparing with before they have to try by themselves and risking reprocessing which is insufficient.
出处
《施工技术》
CAS
北大核心
2017年第18期85-88,共4页
Construction Technology
基金
上海市国际科技合作基金项目(14510701200)
关键词
建筑信息模型
模型
施工组织管理
全纵剖图
角色分析
building information modeling(BIM)
models
management of construction organization
fully longitudinal profile(FLP)