基于角色分析的BIM工作模型与实施方法 被引量:2

Behavior Model and Implementation for BIM Based on Responsibility
下载PDF
导出
摘要 为解决BIM模型在建筑工程现场的落实问题,通过区分BIM工作流程中决策层和执行层的差异,提出了新的工作模型。新模型充分考虑现场应用环节的需求,设计了"全纵剖管线安装图"(FLP)来实现从信息量巨大的完整BIM数据集中提炼、过滤、简化出贴合现场需求的信息。该图具有信息量完备、准确、简洁的特点,实现对全部管线关键信息快速调用,有效发挥BIM模型的潜能,提高了施工效率和质量。 To implement BIM model to physical installation,the procedure and organization of the construction is investigated and the demand difference between decision-makers and executors is discovered which blocks the implement from model to real before. Base on that,a standard of drawings,named "FLP(fully longitudinal profile) "is advised which is used for abstracting necessary information for site-supervision from sophisticated BIM data-set sufficiently. The abstracted result which is saved in a drawing specifies the section dimensions of pipe,location in plan and elevation of pipe and bands.Engineer in site can complete the installation just by following the specifications comparing with before they have to try by themselves and risking reprocessing which is insufficient.
出处 《施工技术》 CAS 北大核心 2017年第18期85-88,共4页 Construction Technology
基金 上海市国际科技合作基金项目(14510701200)
关键词 建筑信息模型 模型 施工组织管理 全纵剖图 角色分析 building information modeling(BIM) models management of construction organization fully longitudinal profile(FLP) role analysis
  • 相关文献

参考文献4

二级参考文献16

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:109
  • 2杨远丰,蔡晓宝.三维管线综合设计实践与技术探讨[J].建筑技艺,2011(1):154-159. 被引量:20
  • 3勒·柯布西耶 陈志华译.走向新建筑[M].西安:陕西师范大学出版社,2004..
  • 4Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 5Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 6Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 7Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 8Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 9Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.
  • 10Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246.

共引文献744

同被引文献15

引证文献2

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部