龙岗大桥钢塔整体同步竖转施工技术 被引量:1

The entire simultaneous vertical swing construction technology of Longgang bridge steel tower
下载PDF
导出
摘要 以汉中市龙岗大桥钢塔竖向转体施工为例,结合桥梁钢斜塔施工工艺,介绍了计算机控制液压同步提升技术在桥梁倾斜钢塔竖转施工中的应用,有效地缩短了施工工期,降低了施工成本。 Taking the vertical swing construction of of Longgang bridge steel tower as an example,combining with the construction technology of bridge steel leaning tower,this paper introduced the application of computer control hydraulic synchronous lifting technology in bridge leaning steel tower vertical swing construction,effectively shorten the construction period,reduced the construction cost.
作者 张柯
出处 《山西建筑》 2017年第25期173-175,共3页 Shanxi Architecture
关键词 钢塔 竖转 整体同步 桥梁 steel tower vertical swing entire simultaneous bridge
  • 相关文献

参考文献2

二级参考文献16

  • 1周念先.桥梁方案优选(九)[J].江苏交通工程,1996(1):12-21. 被引量:1
  • 2Gimsing NJ.Cable Supported Bridges[M].Chichester:John Wiley,1997.
  • 3H Wenzel.Cable Stayed Bridge History Design Application[M].Northern Gate Book Co..Ltd.,1998.
  • 4M.Irvine Cable Structures[M].New York:Dover.1992.
  • 5Manabu Ito.Cable-supported steel bridge:design problem and solutions[J].Journal of construct steel research.1996,39(1).
  • 6Michel Virlogeux.Recent evolution of cable-stayed bridges[J].Engineering Structures.1999,39(5).
  • 7重留正治ほか.本州四国連络橋:明石海峡大橋,多多罗大橋,来岛海峡大橋[J].三菱重工技报,1999,(5):266-269.
  • 8桧山羲光ほか.名港大橋上部工の設計と施工(下)[J].橋梁基础,1994,(12):35-39.
  • 9田井户米好ほか.大和川橋の制作と架設[J].橋梁基础,1982,(1):44-48.
  • 10SATOU Yoshiyuki, HIRAHARA Nobuyuki and MURATA Tomoji, ASANO Masatake. Erection of “Tatara Bridge” [ J], IHI Engineering Review, 2003, 36(2): 65-84.

共引文献25

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部