期刊文献+

活动断层区域城市轨道交通轨道系统设计方案研究 被引量:2

Research on the Design of Track Structure of Urban Rail Transit in Active Fault Zone
下载PDF
导出
摘要 针对乌鲁木齐城市轨道交通1号线穿越的活动断层特点,提出一种综合无砟轨道稳定性好、便于日常巡检和紧急情况下乘客疏散以及有砟轨道便于调整等优点的新型轨道结构设计方案;基于有限元分析方法,评估设计方案的破坏形态;研究活动断层错位时轨道结构的调整、修复方案。结果表明:新型轨道结构设计方案能够满足设计意图,在基底发生空间大变形时能够按设计的破坏形态破坏,且能够满足在活动断层发生瞬时空间大变形破坏后轨道结构可以快速、便捷修复的要求。 According to the characteristics of the active faults where Urumqi urban rail transit line 1 passes through,a new design scheme of ballastless track system is proposed,which is characterized by track stability,convenient tour inspection,quick evacuation in case of emergency,and easy adjustment and ballast track.The failure mode of the new design scheme is evaluated based on FE analysis method.The adjustment and repair scheme of the track structure is researched in case of active fault dislocation.The results show that the new design scheme of track system can meet the functional requirements of track structure during service,and the affected track structure can be repaired quickly and easily once large spatial dislocation of active faults occurs.
出处 《铁道标准设计》 北大核心 2017年第10期33-36,共4页 Railway Standard Design
基金 新疆维吾尔自治区软科学研究计划(K52015042)
关键词 城市轨道交通 活动断层 新型轨道结构 聚氨酯材料固化道床 宽枕板 Urban rail transit Active fault New track structure Polyurethane curing bed Wide track slab
  • 相关文献

参考文献12

二级参考文献90

共引文献101

同被引文献39

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部