期刊文献+

特大断面浅埋暗挖隧道十字岩柱开挖技术模型试验研究 被引量:20

Geomechanical model test on excavation technology of supper-large cross-section ultra-shallow tunnel with cross rock pillar method
下载PDF
导出
摘要 特大断面浅埋暗挖隧道是一种新型隧道,目前尚无相应的设计施工技术规范与标准可循。以重庆市轨道交通3号线红旗河沟车站隧道为工程背景,结合以前施工方法的优缺点,提出了一种新的施工方法十字岩柱法。为了解这种施工方法在施工过程中隧道围岩位移和应力的变化情况,采用地质力学模型试验方法进行研究。试验对监测断面的位移和应力进行系统监测,全方位地了解各开挖步隧道围岩各处的应力与位移变化情况。选取工程背景现场的地质参数,采用ABAQUS软件建立数值分析模型,将数值计算与试验实测结果进行对比,两者的位移与应力变化规律基本一致,这表明模型试验实测的数据比较准确地揭示了隧道围岩位移及应力变化规律。其研究工作可对今后类似工程的施工提供经验和指导。 Recently, a new type tunnel emerges with these main feathers of super-large, cross-section and ultra-shallow. However, there are no relevant technical standards for the design and construction of the station tunnel at present. Taken Hongqihegou Station tunnel in Chongqing Metro 3rd line as the engineering background, a novel excavating method named the cross rock pillar method was developed by considering the advantages and disadvantages of the former methods of tunnel construction. A geomechanical model test was used to monitor stress and deformation of surrounding rock mass of the station tunnel during the process of excavation. The stress and displacement of surrounding rock were comprehensively analyzed during each step excavation. According to the geological parameters of the tunnel, a numerical analysis model was established based on ABAQUS software. By comparing monitoring results with numerical results, it indicates that the variation laws of stress and displacement are essentially the same. It is proved that the model test effectively reveals the variation laws of the stress and displacement of the tunnel. Therefore, this study provides valuable experience and useful guidance for the construction of similar projects in the future.
作者 刘泉声 彭星新 雷广峰 王俊涛 张静 肖龙鸽 LIU Quan-sheng PENG Xing-xin LEI Guang-feng WANG Jun-tao ZHANG Jing XIAO Long-ge(State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan, Hubei 430071, China Key Laboratory of Geotechnical and Structural Safety Engineering of Hubei Province, School of Civil Engineering and Architecture, Wuhan University, Wuhan, Hubei 430072, China University of Chinese Academy of Sciences, Beijing 100049, China China Construction South Investment Co., Ltd., Shenzhen, Guangdong 518022, China)
出处 《岩土力学》 EI CAS CSCD 北大核心 2017年第10期2780-2788,共9页 Rock and Soil Mechanics
基金 国家自然科学基金重点项目(No.41130742) 国家自然科学基金面上项目(No.51474205)~~
关键词 隧道工程 特大断面 超浅埋 十字岩柱 模型试验 tunnelling engineering super-large cross-section ultra-shallow cross rock pillar method model test
  • 相关文献

参考文献13

二级参考文献133

共引文献556

同被引文献221

引证文献20

二级引证文献128

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部