摘要
桂林高新万达广场项目地处在桂林漓江一级阶地,基坑面积巨大。在基坑支护设计过程中,针对基坑特点及环境特点采用了桩锚支护、放坡土钉墙相结合的办法,较完满地解决了基坑支护问题。
The Project of Wanda Plaza in Guilin High-tech Zone locates on Terrace of Li River character with its vast excavating area variety depth of foundation pits in different function area. Base on our thorough investigation both geotechnical surrounding environment, we adopted and combined anchor-hold fender post Soil nailing Wall in the project, and got a satisfactory effect.
出处
《工程建设与设计》
2017年第19期58-61,共4页
Construction & Design for Engineering
关键词
大面积基坑
基坑支护
桩锚支护
放坡土钉墙
vast area foundation pit
slope retaining system
anchor-hold fender post
soil nailing wall