摘要
高空大跨度钢桁架整体液压提升施工技术能够减少高空作业,进而保证施工质量和安全,缩短工期,降低成本。论文对澳门上葡京酒店西标段钢桁架施工进行探讨,通过对"液压整体提升技术"进行运用,从而将拼装完成的钢桁架整体提升到位,使施工安全、质量和工期得到最大程度的保证。
Because hydraulic integral lifting technology of the high-wide-span steel truss can reduce the high-altitude work,ensure the construction quality and safety,shorten the duration,reduce the cost,The construction of steel truss of Primary Structural Steelworks and Sundry Works for Podium(West Portion) for Lisboa Palace Macao is discussed,which is the use of the "hydraulic integral lifting technology",which will assemble the finished steel truss in the integral lifting in place,so that construction safety,quality and duration of the maximum guarantee.
出处
《工程建设与设计》
2017年第19期128-130,共3页
Construction & Design for Engineering
关键词
钢桁架
安装方案
技术措施
液压提升系统
提升步骤
steel truss
installation scheme
technical measures
hydraulic jack system
lifting step