南水北调工程渠道机械化衬砌设计若干问题 被引量:4

Several Issues in Mechanized Channel Lining of South-to-North Water Diversion Project
下载PDF
导出
摘要 为更好适应大型渠道衬砌机械化施工需要,以南水北调工程中线、东线渠道衬砌设计方案为例,总结现有典型大型渠道衬砌总体功能、设计依据及典型设计型式。结合某标段大型渠道机械化衬砌施工和渠道运行管理实践,研究了大型渠道机械化衬砌设计方案在渠基排水、分缝设计、防渗设计、防冻胀设计、渠道衬砌板结构设计及附属设施设计等方面存在的若干问题,并提出了相应的优化设计建议,以期为大型渠道机械化衬砌施工提供参考。 In order to adapt the large-scale water diversion canal lining construction, taking large canal lining construction projects in the water supply project of South- to-North Water Diversion Middle Route Project and East Route Project for an example, this paper summarized the overall functions of channel lining, design plans and several typical design patterns. Combining with the construction of a large-scale canal lining and operation management, it studied several design issues existed during constructions, and put forward the corresponding advices a-bout drainage design of canal foundation, joints design, anti-seepage design, anti-freezing design, structural design of canal lining and ancil-lary facilities to optimize the design plan. Finally, the paper put forward some suggestions to optimize design in channel lining for the next stage.
出处 《人民黄河》 CAS 北大核心 2017年第10期117-120,共4页 Yellow River
关键词 南水北调工程 大型渠道 机械化衬砌 优化 South- to-North Water Diversion Project large-scaled canal mechanized lining optimization
  • 相关文献

同被引文献9

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部