4Abido M A.Environmental/economic power dispatchusing multiobjective evolutionary algorithms[J].IEEETransactions on Power Systems,2003,18(4):1529-1537.
5PILO F, PISANO G, SOMA G. Advanced DMS to manage active distribution networks[C] // 2009 IEEE Bucharest Power Tech, Bucharest, Romania, June 28-July 2, 2009.
6BILLINTON R, FOTUHI-FIRUZABAD M. A reliability framework for generating unit commitment[J]. Electric Power Systems Research, 2000, 56(1): 81-88.
7RUIZ PABLO A, PHILBRICK C, ZAK EUGENE, et al. Uncertainty management in the unit commitment problem[J]. IEEE Trans on Power Systems, 2009, 24(2): 642-651.
8LIU Xiao-ping, DING Ming-han, JIANG Hong, et al. Dynamic economic dispatch for micro grids including battery energy storage[C] // Proceedings of IEEE International Conference on Power Electronics for Distributed Generation Systems, Hefei, IEEE PES, 2010: 914-917.
9CLERC M. The swarm and the queen towards a deterministic and adaptive particle swarm optimization[C] // Proceedings of the Congress on Evolutionary Computation, Piscataway, 1999: 1951-1957.
10D'Adamo C,Jupes,Abbey C.Global survey on planning and operation of active distribution networks-update of CIGRE C6.11 working group activeities[C]//Proceedings of the 20th International Conference and Exhibiton on Electricity Distribution:Part 1,June 8-11,2009,Prague,Czech:1-4.