摘要
文章以实际工程中某电厂的汽轮发电机基础为研究对象,介绍其在天然地基下采用分层总和法计算的地基沉降,结果满足《火力发电厂土建结构设计技术规程》中对应的容许值。
A turbo-generator foundation is taken as a research object in this article,lyerwise summation method to calculate the foundation settlement of the turbo-generator foundation under natural foundation is introduced, the results meet the permissible value of the Technical code for the design of civil structure of fossil-fired power plant.
出处
《科技视界》
2017年第17期48-48,34,共2页
Science & Technology Vision
关键词
分层总和法
汽轮发电机基础
地基沉降
L ayerwise summation method
Turbo- generator foundation
Foundation -settlement