摘要
塔楼结构是升船机的主体建筑物,针对景洪水电站水力式升船机塔楼的受力特点,采用数值计算方法及模型试验方法对水力式升船机塔楼结构进行深入研究。结果表明:数值计算结果和模型试验结果基本一致。通过施工完建后的相关监测结果对该设计进行论证,可为同类水力式升船机的塔楼设计提供借鉴。
The tower is the main building of ship lift.Aiming at the force characteristics of the hydraulic ship lift of Jinghong hydropower station, we apply numerical calculation and model experiment for deeply studying the tower structure of hydraulic ship lift. The results show that the numerical results are in good agreement with the model test results.We use the relevant monitoring results after construction to prove the design, and the results can provide reference for the tower design of similar hydraulic ship lift.
出处
《水运工程》
北大核心
2017年第10期48-53,85,共7页
Port & Waterway Engineering
关键词
水力式升船机
塔楼
数值计算
模型试验
安全监测
hydraulic ship lift
tower
numerical calculation
model experiment
safety monitoring