摘要 以郑州市轨道交通8号线工程为例,全面梳理地铁与综合管廊的空间关系,并按建设时序进行分类,深入研究各种条件下处理地铁与管廊工程的协调方案,从地铁区间、车站附属以及车站主体3个方面提出综合利用城市地下空间可实施的解决方案。综合管廊与地铁区间相交时,地铁设计在纵向上加大埋深;与车站附属相交时,根据建设时序选择双方上下层关系;与车站主体相交时,根据建设时序选择合建或者绕避,可为类似工程提供借鉴思路。 Taking Zhengzhou Metro Line 8 as an example, the paper summarized the spatial relationship between the metro and the utility tunnel, classified the construction sequence of them and researched the coordination scheme of subway and utility tun- nel under various conditions. The solutions to the comprehensive utilization of urban underground space are put forward from three aspects: metro tunnels, station subsidiary and station main body. When the utility tunnel intersects the metro tunnels, the design of the metro tunnels should increase the depth in the longitudinal direction; when the utility crosses the station auxiliary, the relation between the upper and lower layers is selected according to the construction timing; when crossing with the main body of the station, the co-building or bypassing shall be selected according to the construction timing.
作者 王贺敏
出处 《都市快轨交通》 北大核心 2017年第5期65-69,共5页 Urban Rapid Rail Transit
关键词 地铁 综合管廊 统筹协调 空间关系 metro utility tunnel overall coordination space relation
  • 相关文献

参考文献5

二级参考文献23

共引文献226

同被引文献61

引证文献15

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部