期刊文献+

四方井水利枢纽工程弃渣场选址及水土保持措施设计要点 被引量:2

Site Design of Dump Site and Design Points of Soil and Water Consevation Measures in Sifangjin Water Control Project
下载PDF
导出
摘要 以四方井水利枢纽工程为例,从弃渣场的地形地质条件、水文特征、对行洪安全和库容的影响、弃渣时序合理性等方面分析评价了弃渣场选址的合理性,因地制宜地提出了合理布置拦挡、护坡、排水、植被绿化等措施,以期为类似水利工程弃渣场水土保持设计提供参考。 Taking the project of Sifangjing Hydro-Junction as an example, this paper analyzes and evaluates the rationality of the location of the dregs from the aspects of the terrain and geological conditions, the hydrological characteristics, the impact on the flood safety, the storage capacity and the rationality of the slagging time. According to local conditions, reasonable arrangement of block, slope protection, drainage, vegetation greening and other measures, can provide reference for water and soil conservation design of spoil water in similar water conservancy project..
作者 陈涛 龚新 Chen Tao Gong Xin(Institute of water resources planning and design in J iangxi Province, Nanchang , J iangxi , 330029, Chin)
出处 《绿色科技》 2017年第20期18-20,共3页 Journal of Green Science and Technology
关键词 弃渣场 选址 水土保持措施 水利枢纽 Spoil field, Location, Soil and water conservation measures, Hydro-Junction
  • 相关文献

参考文献7

二级参考文献21

共引文献80

同被引文献13

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部