摘要
为在激烈的物流市场竞争中立足和发展,加强铁路物流全程时限优化管理具有重要意义。在阐述铁路物流全程时限内涵及管理现状的基础上,从市场经营理念、货源结构差异、运输组织方式、两端衔接组织及其他不可抗力因素等方面分析铁路全程时限的关键因素,提出铁路物流全程时限优化管理的发展对策,即树立全程时限与服务理念、优化铁路运输产品结构与过程组织、强化多式联运组织协同与无缝衔接、加强全程物流过程透明与监控预警。
In order to optimize the whole process delivery time management for railway logistics is of great significance for itself to be built and expanded in the logistics market with intense competition. Based on the elaboration of the definitions and current status of railway logistics delivery management, this paper analyzes the critical factors, such as marketing and business concepts, difference of the cargo source structure, transport organization methods, connections at both ends and other factors beyond human control. Then, the solution for the optimization of the whole process delivery time management is proposed in the following aspects: fostering the concepts on whole process delivery time and service, optimizing the structure and process organization, improving multi-modal coordination and seamless connection, intensifying the transparency of the process and the monitoring and early warning.
作者
史铁瑛
SHI Tie-ying(The Second Senior High School of Mudanjiang City, Mudanjiang 157005, Heilongjiang, China)
出处
《铁道运输与经济》
北大核心
2017年第10期26-30,共5页
Railway Transport and Economy
关键词
铁路物流
全程时限
时效服务
优化管理
发展对策
Railway Logistics
Whole Process Delivery Time
On-time Service
Management Optimization
Development Solution