摘要
传统水文站水位、流量两个测验设施要分开建设,投资大、占地多。通过对新建的双桥、府城、天马等水文站水位台和缆道房建设方案的分析,探讨同时建设水位台与水平式ADCP安装测流平台,满足水位、流量两个功能的建设方案,确定新建水文站水位和流量测验设施建设的几种设计方案。
At traditional hydrological stations, water level and flow measurement facilities were constructed separate-ly which required higher cost and more land. Analysis was made on the water level platform and cable room con- struction scheme for new Shuangqiao, Fucheng and Tianma hydrological stations, based on which the author put for- ward a construction scheme incorporating water level platform with horizontal ADCP flow measurement platform, and presented several design schemes of level/flow measurement facilities for new hydrological stations.
出处
《广西水利水电》
2017年第5期40-43,47,共5页
Guangxi Water Resources & Hydropower Engineering
关键词
水位台
ADCP
测流平台
缆道房
设计方案
Water level platform
ADCP
flow measurement platform
cable room