摘要 滨海火/核电厂以海水作为冷却水源,取水口所处水域水动力条件十分复杂,其中波浪是取水口结构受到的主要动力荷载。文章以浙能镇海电厂燃煤机组搬迁改造项目循环取水口为例,采用物理模型试验方法研究了波浪作用下蘑菇头式取水口的结构受力情况。试验结果表明,在波浪作用下,取水头受到的总力基本不受相邻取水头的影响,垂向和水平向总力随水位变化,其最大总力发生在不同水位。 Thermal or nuclear power plant in coastal area takes sea water as cooling water source, and the hydrodynamicconditions of water intake are very complex, in which wave is the main dynamic load of water intake structure. By taking thecirculating water intake system of Zheneng Zhenhai coal power station relocation project as an example, we investigated waveloads on mushroom shape intake structure using physical model studies. It is found that the total wave force on intake structureis not affected by neighbours. Vertical and horizontal forces vary with water level, the maximum total force occurs at differentwater level.
出处 《中国港湾建设》 2017年第10期53-56,共4页 China Harbour Engineering
关键词 波浪 取水口 受力 wave intake structure wave force
  • 相关文献

参考文献2

二级参考文献13

  • 1李富铜,丘宜平,潘载雄.东江—深圳供水三期扩建工程东江抽水站引水口防淤工程措施研究[J].广东水电科技,1995(4):17-21. 被引量:3
  • 2JTS167-2-2009重力式码头设计与施工规范[S].
  • 3JTS145-2-2013海港水文规范[S].
  • 4王登婷;潘军宁.深圳LNG项目取水口结构稳定性物模试验报告[R]南京:南京水利科学研究院,2011.
  • 5王登婷;潘军宁.广东华厦阳西电厂一期工程首二台机组取水口波浪力物理模型试验报告[R]南京:南京水利科学研究院,2007.
  • 6李鹏;琚烈红.广西中电防城港电厂一期工程循环水排水沟道及排水口物理模型试验报告[R]南京:南京水利科学研究院,2006.
  • 7李鹏;王红川.斯里兰卡普塔拉姆燃煤电站(l×300 MW)工程取、排水口波浪模型试验研究报告[R]南京:南京水利科学研究院,2009.
  • 8李鹏.沙特Rabigh 2×660 MW燃油机组工程取、排水口波浪模型试验研究报告[R]南京:南京水利科学研究院,2010.
  • 9郝瑞霞,毕慧英,曹靖,宋连瑞.惠州电厂取水口至泵房过渡前池的水力特性研究[J].科技情报开发与经济,2008,18(7):151-153. 被引量:3
  • 10吕文翠,彭清娥,张文江.镇雄电厂一期取水口泥沙模型试验研究[J].东北水利水电,2009,27(2):54-56. 被引量:3