期刊文献+

中厚板坯料优化设计系统研究与应用 被引量:3

Research and Application for Medium Steel Plate-Slab Design System
下载PDF
导出
摘要 通过对生产和设计流程的分析,采用分层模块化设计方法,将应用维护、设计管理与数据支撑按不同类型问题分别进行功能模块划分并构建系统的体系结构,开发了中厚板坯料优化设计系统.系统重点解决了生产中涉及的一维和二维两种组合模式下的母板板坯一体化设计问题,综合考虑最小化余材、最大化板坯轧制成材率,提出了结合最优化技术和启发式规则的混合优化设计方法.基于某钢厂的实例数据测试表明,系统在整体设计质量和效率方面均明显优于人工设计. On the basis of the analysis of the production and design process, a medium steel plate- slab design system (MSPSDS) was built by employing the layered modular design method. The system architecture of MSPSDS was developed by separating the functional moduli for different types of problems including application maintenance, design management and data supporting. MSPSDS focuses on solving steel plate-slab integrated optimal design problems under one and two dimensions. A hybrid solving method was proposed by combining optimization techniques and heuristic rules for minimizing the amount of surplus material and maximizing the rolling yield. The test experiments conducted by using the data instance from a steel plant showed that MSPSDS significantly outperforms manual design both in terms of quality and efficiency.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2017年第10期1405-1410,共6页 Journal of Northeastern University(Natural Science)
基金 国家自然科学基金资助项目(51474044) 重庆市科技攻关重点项目(CSTC2011AB3053)
关键词 中厚板 坯料设计 下料问题 一体化 系统开发 medium steel plate slab design cutting stock problem integration system development
  • 相关文献

参考文献3

二级参考文献23

  • 1龙德,么健石,徐心和.铁水运输系统智能仿真模型[J].东北大学学报(自然科学版),2005,26(6):523-526. 被引量:9
  • 2梁立棉,张国滨.坯料设计在提高中厚板成材率中的应用[J].河北理工学院学报,2007,29(2):57-61. 被引量:7
  • 3HNICH B, KIZILTAN Z, MIGUEL I, et al. Hybrid model- ling for robust solving[J]. Ann Oper Res, 2004, 130 (1/2/3/4):19-39.
  • 4GARGANI A, REFALO P. An efficient model and strategy for the steel mill slab design problem[C]//Proceedings of the 13th International Conference on Principles and Practice of Constraint Programming. Berlin, Germay: Springer-Verlag, 2007 : 77-89.
  • 5VAN HENTENRYCK P, MICHEL L. The steel mill slab de- sign problem revisited[C]//Proceedings of the 13th Interna- tional Conference on Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Prob- lems. Berlin, Germay: Springer-Verlag, 2008 : 377-381.
  • 6VONDEREMBSE M A, HAESSLER R W. A mathematical programming approach to schedule master slab casters in the steel industry[J]. Manage Science,1982,28(12):1450-1461.
  • 7DASH S, KALAGNANAM J, REDDY C, et al. Production design for plate products in the steel industry[J]. IBM Journal of Research and Development, 2007,51 (3/4) : 345-362.
  • 8DENTON B, GUPTA D, JAWAHIR K. Managing increasing product variety at integrated steel mills[J]. Interfaces, 2003, 33(2) :41-53.
  • 9FRISCH A M, MIGUEL I, WALSH T. Modeling a steel mill slab design problem[EB/OL] [2011-9-10]. http://www, es. york. ac. uk/aig/projects/implied/docs/Modeling01, pdf.
  • 10DAWANDE M, KALAGNANAM J, LEE H S, et al. The slab-design problem in the steel industry[J]. Interfaces,2004, 34(3) :215-225.

共引文献11

同被引文献40

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部