轨道交通盾构区间下穿有轨电车路基沉降控制研究与实践 被引量:2

Research & Practice of Subgrade Settlement Control of Rail Transit Shield Interval Underneath Passing Tram
下载PDF
导出
摘要 以成都某轨道交通盾构区间下穿有轨电车为例,结合成都砂卵石地层特点,通过MIDAS GTS数值模拟软件,对盾构区间下穿有轨电车路基的沉降影响进行综合分析研究。结果表明:盾构隧道下穿有轨电车路基时,不考虑地基加固,最大沉降量为12.3 mm;考虑采用CFG桩复合地基加固时,最大沉降量为7.5 mm。完全满足有轨电车无砟轨道平顺性及沉降要求,为工程实施提供设计参考。 Taking Chengdu some rail transit shield interval crossing underneath the tram as an example,combined with Chengdu regional characteristics of the sand & gravel strata,through the MIDAS GTS numerical simulation software,the settlement influence of shield interval crossing underneath tram subgrade is made comprehensive analysis research.The results show that the shield tunnel crossing underneath the tram subgrade,without considering the foundation reinforcement,the max settlement is about 12.3 mm; considering the reinforcement of CFG pile composite foundation,the max settlement is about 7.5 mm; which can meet the requirements totally of tram ballastless track smoothness and settlement and can provide design reference for similar projects.
作者 马伟东
出处 《中国市政工程》 2017年第5期26-29,共4页 China Municipal Engineering
关键词 轨道交通盾构区间 下穿 有轨电车 路基沉降 rail transit shield interval underneath pass tram foundation settlement
  • 相关文献

参考文献5

二级参考文献25

共引文献254

同被引文献5

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部