5D.E.Akyol,G.Tuncel and G.M.Bayhan,“A comparative analysis of activity-based costing and traditional costing,” World Academy of Science,Engineering and Technology,3,pp.44-47,2005.
6D.Ben-Arieh,and L.Qian,“Activity-based cost management for design and development stage,“International Journal of Production Economics,wol.83,pp.169-183,2003.
7R.Cooper and R.S.Kaplan,“Measure Costs Right:Make the Right Decisions“ Harvard Business Review (Sept.-Oct.1988),pp96-103.
8A.Gunasekaran,and M.Sarhadi,“Implementation of activity-based costing in manufacturing,“ International Journal of Production Economics,vol.56-57,pp.231-242,1998.
9M.Gupta and K.Galloway,“Activity-based costing/management and its implications for operations management,“Technovation 23,pp.131-138,2003.
10R.S.Kaplan,“One Cost System Isn't Enough” Harvard Business Review (Jan.-Feb.1988).