摘要
韶关钢铁集团有限公司炼铁厂受到原燃料品质下降的影响,炉况失常,决定对高炉进行停炉中修。详细介绍了停炉的全过程,包括降料面前的炉况、休风前的准备、停炉操作、炉外出铁等环节,总结了此次停炉中修的成功经验。
Affected by the quality of raw fuels,the furnace of the iron works of Shaoguan Iron and Steel Group Co.Ltd.has been abnormal in condition,which makes the furnace maintenance necessary.A detailed introduction has been made to the whole process of the furnace shutdown,including the conditions of the falling surface,preparatory work before the blowing-down,the operation of the furnace shutdown and the tapping outside the furnace,followed by a summary of the successful experience of the shutdown repairing.
出处
《湖南工业大学学报》
2017年第4期50-54,共5页
Journal of Hunan University of Technology
关键词
高炉
降料面
休风
停炉
炉外出铁
风口
blast furnace
falling surface
blowing-down
shutdown
tapping outside the furnace