期刊文献+

考虑适时倒箱的进口重箱区多场桥调度优化 被引量:2

Multi-yard cranes scheduling optimization of inbound full container block with timely relocation
原文传递
导出
摘要 为提高进口重箱区的提箱作业效率,减少提箱外集卡的等待时间,研究固定时段内该类箱区的多场桥调度优化.重点考虑场桥作业过程中待提箱上压箱翻倒时机及落位的影响,兼顾作业场桥之间不可跨越和保持一定安全距离等现实约束,以所有外集卡总等待时间和超过等待容忍限度总时间的加权和最小为优化目标,构建了一个非线性规划模型,设计了融入交叉变异策略和禁忌搜索算法的改进和声搜索算法.通过数值实验,验证了方案及算法的有效性. To improve the retrieval efficiency of the inbound full container block, as well as reduce the waiting time of the external container truck, the scheduling optimization of multi-yard cranes is studied within a fixed time period. Considering the time and location of those stacked boxes upon the container needed to be retrieved, along with the non-crossing and safe distance among cranes during working period, a nonlinear programming model is built to minimize the weighted sum of the total waiting time and the time exceeding the tolerance limit. Then an improved harmony search algorithm is put forward to solve the model, which not only embeds the crossover and mutation strategy but also integrates the tabu search algorithm. Finally, numerical experiments are conducted to validate the effectiveness of the proposed model and algorithm.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2017年第10期2700-2714,共15页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(71473024 71273037)~~
关键词 进口重箱区 多场桥调度 倒箱 改进和声搜索算法 inbound full container block multi-yard cranes scheduling relocation improved harmony search algorithm
  • 相关文献

参考文献5

二级参考文献47

  • 1韩晓龙.集装箱港口龙门吊的最优路径问题[J].上海海事大学学报,2005,26(2):39-41. 被引量:24
  • 2王斌.集装箱码头堆场的一种动态随机堆存方法[J].系统工程理论与实践,2007,27(4):147-153. 被引量:31
  • 3张敏,袁辉.拉依达(PauTa)准则与异常值剔除[J].郑州工业大学学报,1997,18(1):84-88. 被引量:136
  • 4Li W, Wu Y, Petering M E H, et al. Discrete time model and algo- rithms for container yard crane scheduling. European Journal of Oper- ational Research, 2009 ;198( 1 ) : 165-172.
  • 5Ng W C, Mak K L. Yard crane scheduling in port container termi- nals. Applied Mathematical Modelling, 2005 ;29 ( 3 ) : 263-276.
  • 6Kim K H, Kim K Y. An optimal routing algorithm for a transfer crane in port container terminals. Transportation Science, 1999 ; 33 ( 1 ) : 17-33.
  • 7Zhang C, Wan Y, Liu J, et al. Dynamic crane deployment in con- tainer storage yards. Transportation Research Part B : Methodological, 2002; 36(6): 537-555.
  • 8Linn R, Liu J, Wan Y, et al. Rubber tired gantry crane deployment for container yard operation. Computers & Industrial Engineering, 2003 ; 45 ( 3 ) : 429-442.
  • 9Murty K G,Liu J,Wan Y W,et al. DSS for operation in container ship- ping terminal, http://www, personalengin, umich, edu/murty/,2003.
  • 10Javanshir H, Seyedalizadeh Ganji S R. Yard crane scheduling in port container terminals using genetic algorithm. Journal of Industrial En- gineering International, 2010; 6( 11 ) : 39-50.

共引文献39

同被引文献11

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部