期刊文献+

面向多IEC 61850服务器仿真的雪崩测试优化研究 被引量:2

Optimization on High Speed Avalanche Test Model for Multiple IEC 61850 Server Simulation
下载PDF
导出
摘要 针对站控层主机、远动装置等IEC 61850客户端产品的功能和压力测试,如数百台设备的雪崩并发测试和制造报文规范(MMS)链路容量测试,搭建实际装置环境耗时耗力,只能采用软件仿真方式来实现。首先阐述了多装置的IEC 61850服务器仿真的原理与结构,另外在多IEC 61850服务器仿真系统中采用虚拟机技术和时间片轮转原理实现了雪崩测试模型的优化,可在数十毫秒内成功发送300台装置的1 200个报告服务。研究成果缩短了客户端测试环境的搭建时间,优化了雪崩并发测试的速率,可有效地验证客户端数据库和通信的实时处理能力。 Regarding the functional testing and stress testing for the substation level host and tele-control devices, such as avalanche coneurrent test and MMS link capacity test involving several hundreds of devices, it is very time and effort consuming to build the actual test environment. Therefore the software simulation turns out to be the only way to perform the testing. In this paper, the authors first elaborated the principle and structure of the device server simulation of MMS. Then based on virtual machine technology and the time slice rotation principle in multi-server simulation system, the high speed avalanche test model is optimized, which is capable of sending 1 200 reporting service data for 300 devices successfully within the tens of milliseconds range. The research accomplishments can shorten the time spent on the establishment of the test environment at the client end, optimize the speed of the avalanche concurrent test, and henee effectively verify the client database and the real-time processing capability.
出处 《中国电力》 CSCD 北大核心 2017年第10期78-82,共5页 Electric Power
关键词 多IEC 61850服务器仿真 虚拟机技术 时间片轮转 雪崩测试 multi IEC 61850 server simulation virtual machine technology round robin avalanche experiment
  • 相关文献

参考文献15

二级参考文献202

共引文献726

同被引文献14

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部