期刊文献+

基于强化区间线性规划的工程项目模糊多目标均衡优化 被引量:1

Fuzzy Multi-objective Trade-off of Construction Project Based on Enhanced Interval Linear Programming Method
下载PDF
导出
摘要 文章考虑工程项目实施过程中的不确定因素,建立工期、成本、质量模糊均衡优化(FTCQP)模型;运用分解定理、强化区间线性规划(EILP)方法,求出各目标的最优值区间;进一步引入模糊偏好关系,运用模糊折衷规划法,得到FTCQP模型的最优模糊折衷解。最后通过案例分析验证了方法的合理性、有效性和可操作性。 In view of the uncertainty during construction process, this paper constructs a fuzzy trade-off model about time, cost and quality (FTCQP). Firstly, the paper works out the optimal value interval by use of the decomposition theorem and en- hanced interval linear programming (EILP) method. And then the paper introduces fuzzy preference relation and employs fuzzy compromise programming to obtain the optimal compromise solution of FTCQP model. Finally a case analysis is done to verify the rationality, effectiveness and operability of the proposed method.
出处 《统计与决策》 CSSCI 北大核心 2017年第20期172-176,共5页 Statistics & Decision
基金 国家自然科学基金资助项目(51408459)
关键词 模糊多目标优化 风险水平 强化区间线性规划 模糊折衷规划 模糊偏好关系 fuzzy multi-objective optimization risk level enhanced interval linear programming fuzzy compromise pro-gramming fuzzy preference relation
  • 相关文献

参考文献7

二级参考文献63

共引文献115

同被引文献5

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部