摘要
文章考虑工程项目实施过程中的不确定因素,建立工期、成本、质量模糊均衡优化(FTCQP)模型;运用分解定理、强化区间线性规划(EILP)方法,求出各目标的最优值区间;进一步引入模糊偏好关系,运用模糊折衷规划法,得到FTCQP模型的最优模糊折衷解。最后通过案例分析验证了方法的合理性、有效性和可操作性。
In view of the uncertainty during construction process, this paper constructs a fuzzy trade-off model about time, cost and quality (FTCQP). Firstly, the paper works out the optimal value interval by use of the decomposition theorem and en- hanced interval linear programming (EILP) method. And then the paper introduces fuzzy preference relation and employs fuzzy compromise programming to obtain the optimal compromise solution of FTCQP model. Finally a case analysis is done to verify the rationality, effectiveness and operability of the proposed method.
出处
《统计与决策》
CSSCI
北大核心
2017年第20期172-176,共5页
Statistics & Decision
基金
国家自然科学基金资助项目(51408459)
关键词
模糊多目标优化
风险水平
强化区间线性规划
模糊折衷规划
模糊偏好关系
fuzzy multi-objective optimization
risk level
enhanced interval linear programming
fuzzy compromise pro-gramming
fuzzy preference relation